Utility Installation

Today was an exciting day. After waiting for almost 3 years the excavators moved on the property and started working on the utility installation. This is a picture of some…

0 Comments

Concrete Structures

Today, the first load of sewage and stormwater concrete structures arrived on the property. Almost all of these items will be buried in the ground with just a cover or…

0 Comments

Pre-Construction Meeting

Today, we had the pre-construction meeting for installing phase 1 of the utilities. There were nine men at the meeting and each of them had authority in some aspect of…

0 Comments

Bible Quizzing

In 2013, Servant's Heart added Bible quizzing as part of its ministry. Bible quizzing encourages teenagers to study and memorize scripture and it has been a blessing. Last year, we…

0 Comments

Postponed

Many of you know that today was the day we were scheduled to have our preconstruction meeting for phase 1 of the utility installation. Because of the snow, wind and…

0 Comments

STAKE OUT

A little over one month ago, we signed a contract for an excavator to begin installing phase 1 of our utilities. Once again the progress has been a bit slower…

0 Comments

Property Update

Recently, we realized that the pictures on the “About Us” tab of our website were way outdated. If you would like to see some updated pictures of the property, click…

0 Comments

Utility Update

On November 1, just an hour before our fall board meeting, we received the approved Planning Module from the PA DEP. Although we thought that was the final document that…

0 Comments

Young at Heart

In July 2013, we had our first Young at Heart Day for friends of the camp that are over 55 years old. Although, it rained a good portion of the…

0 Comments

Beaver

In the last several weeks one or more beavers have moved in and taken up abode at SHCM. The area they have chosen to cut trees is right by the…

0 Comments

End of content

No more pages to load