In spite of the bitter cold temperatures and lots of snow, the utility installations is moving forward. The picture above was taken on one of the few warm days. All of the gravity sewer lines are installed from the manholes to the collection wetwell, and a good portion of the water lines are installed. Here are a few
more pictures of the progress.