Electrical Panels

We now have (2) 800 amp electrical panels installed on the property for a total of 1600 amps. Wow, that should give us enough power to expand until Christ returns.…

0 Comments

Spring Work Days

This past Thursday, Friday, and Saturday, we our scheduled spring work days. About 25 people came to help with various projects. Wow, what a blessing! We put up the game…

0 Comments

Water at SHCM!!

Last week, the water company connected the last 17" inches (the water meter) needed to have water on the property. Although it is not yet hooked to the cabins, we…

0 Comments

Wagon Rides!

As I approached the lake one morning last week, I noticed something unusual on the basketball court on the other side. I was thrilled when I found a very solid…

0 Comments

Stream Crossing

The excavators installed the waterlines and electric conduit under the stream. Although we were not here when the excavators did the stream crossing, the neighbor told us that there was…

0 Comments

Sand for the Lake

U.S. Silica in Mapleton graciously donated 23 tons of beautiful light sand for use in our lake. It was delivered a few weeks ago and it is waiting for some…

0 Comments

AmazonSmile

Amazon will donate .05% of your normal purchases to Servant's Heart Camp if you sign in at smile.amazon.com. After you sign in, select Servant's Heart Camp as you charity. Amazon…

0 Comments

Bunk Beds

After a long day this past Saturday, eight additional sets of bunk beds were installed in cabins. The time spent on Saturday, however, was just the tip of the iceberg…

0 Comments

Final Permit

Earlier this week, the excavators finished their portion of the 1st phase of the utility installation. Today, we received our final permit from the PA DEP for the 2nd phase…

0 Comments