We now have (2) 800 amp electrical panels installed on the property for a total of 1600 amps. Wow, that should give us enough power to expand until Christ returns.…
We now have (2) 800 amp electrical panels installed on the property for a total of 1600 amps. Wow, that should give us enough power to expand until Christ returns.…
Last week, the water company connected the last 17" inches (the water meter) needed to have water on the property. Although it is not yet hooked to the cabins, we…
The excavators installed the waterlines and electric conduit under the stream. Although we were not here when the excavators did the stream crossing, the neighbor told us that there was…
Earlier this week, the excavators finished their portion of the 1st phase of the utility installation. Today, we received our final permit from the PA DEP for the 2nd phase…
In spite of the bitter cold temperatures and lots of snow, the utility installations is moving forward. The picture above was taken on one of the few warm days. All…
Today was an exciting day. After waiting for almost 3 years the excavators moved on the property and started working on the utility installation. This is a picture of some…
Today, the first load of sewage and stormwater concrete structures arrived on the property. Almost all of these items will be buried in the ground with just a cover or…
Today, we had the pre-construction meeting for installing phase 1 of the utilities. There were nine men at the meeting and each of them had authority in some aspect of…
Many of you know that today was the day we were scheduled to have our preconstruction meeting for phase 1 of the utility installation. Because of the snow, wind and…
A little over one month ago, we signed a contract for an excavator to begin installing phase 1 of our utilities. Once again the progress has been a bit slower…