Getting Framed In
With the help of the CLAIM group from BIMI, lots of progress has been made on the lodge in the past two weeks. Thirteen doors and thirty-three windows have been…
0 Comments
August 22, 2025
With the help of the CLAIM group from BIMI, lots of progress has been made on the lodge in the past two weeks. Thirteen doors and thirty-three windows have been…
The windows are being installed on the front of the lodge. This is from the outside of the kitchen. Concrete is scheduled to be poured on the front porches next…