Getting Framed In
With the help of the CLAIM group from BIMI, lots of progress has been made on the lodge in the past two weeks. Thirteen doors and thirty-three windows have been…
With the help of the CLAIM group from BIMI, lots of progress has been made on the lodge in the past two weeks. Thirteen doors and thirty-three windows have been…
After David and Dave spend a couple days on the scaffolding preparing for the upcoming A-Frame window to be installed, they started to go a little crazy and came up…
Yes, that was misspelled on purpose! The work group has done a fantastic job, and it is so exciting to see the lodge exterior transformed not only with doors and…
The exterior doors for the lodge have arrived. This picture is a portion of the $50,000 worth of doors which were delivered this week.
This morning the concrete guys poured the front decks and steps. It is another exciting step as we move forward with the project.
The windows are being installed on the front of the lodge. This is from the outside of the kitchen. Concrete is scheduled to be poured on the front porches next…
The men are making excellent progress on installing the forms for the concrete for the two front porches. As we look forward to future steps, we need two things. We…
The steel for the front porches on both sides is now set. It is almost ready for concrete!
Although things have been moving forward on the lodge, progress has not been as visible for the past several weeks. Yesterday, however, the steel arrived for the front decks. The…