Front Decks
This morning the concrete guys poured the front decks and steps. It is another exciting step as we move forward with the project.
This morning the concrete guys poured the front decks and steps. It is another exciting step as we move forward with the project.
The windows are being installed on the front of the lodge. This is from the outside of the kitchen. Concrete is scheduled to be poured on the front porches next…
The men are making excellent progress on installing the forms for the concrete for the two front porches. As we look forward to future steps, we need two things. We…
The steel for the front porches on both sides is now set. It is almost ready for concrete!
Although things have been moving forward on the lodge, progress has not been as visible for the past several weeks. Yesterday, however, the steel arrived for the front decks. The…
The guys are making great progress on the stairwell and footers for the front decks.
Today another important step of progress is being made on the lodge. The roof is being installed! We are grateful that God has allowed us to reach this milestone in…
Today we installed a grease interceptor for our new kitchen in the lodge. It will catch the fats, oils, and grease that are washed down the drain and will be…
Despite the recent rain, slow and steady progress continues on the lodge. Here you can see work being done on the back porch. This porch will be a main entrance…