Water at SHCM!!

Last week, the water company connected the last 17″ inches (the water meter) needed to have water on the property. Although it is not yet hooked to the cabins, we now have water at SHCM. To God be the glory.

Stream Crossing

The excavators installed the waterlines and electric conduit under the stream. Although we were not here when the excavators did the stream crossing, the neighbor told us that there was no mud in the stream while they were digging.

The BBC work team seeded and mulched the one side of the creek. The seeding and mulching still needs to be done on the other side of the creek.