Utilty Installation Continues

In spite of the bitter cold temperatures and lots of snow, the utility installations is moving forward. The picture above was taken on one of the few warm days. All of the gravity sewer lines are installed from the manholes to the collection wetwell, and a good portion of the water lines are installed. Here are a few
more pictures of the progress.

Utility Installation

Today was an exciting day. After waiting for almost 3 years the excavators moved on the property and started working on the utility installation. This is a picture of some of the equipment coming across the breast of the lake. I have also included the procession in a video.

Here is a link with some pictures of the first day’s work – PICTURES