Stream Crossing

The excavators installed the waterlines and electric conduit under the stream. Although we were not here when the excavators did the stream crossing, the neighbor told us that there was no mud in the stream while they were digging.

The BBC work team seeded and mulched the one side of the creek. The seeding and mulching still needs to be done on the other side of the creek.

Final Permit

Earlier this week, the excavators finished their portion of the 1st phase of the utility installation. Today, we received our final permit from the PA DEP for the 2nd phase of the installation. Praise God that things are moving forward in His perfect timing.